TISAX certification (formally a TISAX assessment and label) is now a condition of doing business with most European carmakers and their Tier 1 suppliers. This guide explains, step by step, how to achieve TISAX: what the VDA ISA 6 catalogue requires, which TISAX labels and assessment levels you need, how the ENX registration and TISAX audit work, what TISAX costs, how long it takes, and how to build on ISO 27001.
Key takeaways
- TISAX is the automotive industry’s shared information security assessment, governed by the ENX Association and based on the VDA ISA catalogue.
- Your customer’s information decides your TISAX labels; the labels decide whether you face an AL2 or AL3 assessment.
- Every applicable VDA ISA control must reach maturity level 3, and you must prove it with records.
- ISO 27001 helps, but TISAX adds maturity scoring, prototype protection, OT availability and a wider scope.
- Plan four to six months with a mature ISMS, and eight to twelve months without one.
TISAX certification at a glance: what automotive suppliers need to know
TISAX is achievable in six to twelve months when it is run as a programme, not an audit
The short version. TISAX is the automotive industry’s shared way of proving information security. You register with the ENX Association, an approved audit provider assesses you against the VDA ISA catalogue, and the result is exchanged with your customers for three years. Success depends less on technology than on reaching maturity level 3 on every applicable control and being able to show the evidence.
This guide is written for the people who have to deliver a TISAX label: CISOs, IT heads, quality and compliance managers, plant heads and the executives who sponsor them. It explains the rules as published by the ENX Association and the VDA, and adds the practical detail that the official documents leave to the reader.
Ten facts to hold on to
| # | Fact | Why it matters |
|---|---|---|
| 1 | TISAX produces labels, not a certificate | Results live in the ENX portal and are shared with named partners |
| 2 | The requirements are in the VDA ISA catalogue, version 6 | One spreadsheet holds every control, requirement and maturity definition |
| 3 | Your customer’s data decides your assessment objectives | Objectives decide the controls in scope and the assessment level |
| 4 | Assessment level 2 is a plausibility check; level 3 adds on-site verification | Level 3 needs more time, travel and physical readiness |
| 5 | The target is maturity level 3 on every control | Scores above 3 are cut back to 3, so strengths cannot offset weaknesses |
| 6 | The standard scope covers everything you are responsible for at each location | A narrow scope is not an option in practice |
| 7 | A firm that has consulted for you cannot assess you | Keep your readiness partner and audit provider separate |
| 8 | Findings must be closed within nine months | Longer plans mean no labels |
| 9 | Labels are valid for three years, with no surveillance audits | Discipline between assessments is your responsibility |
| 10 | ISO/IEC 27001 helps but does not replace TISAX | Expect extra work on maturity evidence, prototypes, OT and scope |
How to use this guide
Chapters 2 to 4 explain the mechanism and the catalogue. Chapters 5 to 7 walk through the controls. Chapters 8 to 11 cover objectives, scope, ISO 27001 and the assessment process. Chapters 12 to 17 are the working chapters: how to build the system, what usually goes wrong, timelines, costs and what to do after the label. Checklists, FAQs and a glossary close the guide.
What is TISAX? The automotive information security assessment explained
TISAX exists so that one assessment can serve every customer

Carmakers share drawings, prototypes, production schedules and personal data with thousands of suppliers. Before TISAX, each manufacturer audited each supplier against its own questionnaire, and a supplier with five customers could face five audits a year on the same controls.
The industry’s answer came in two parts. First, the German Association of the Automotive Industry (VDA) agreed a common questionnaire, the Information Security Assessment or ISA. Second, in 2017 the ENX Association launched TISAX, the Trusted Information Security Assessment Exchange, so that one assessment against the ISA by a neutral audit provider would be accepted by all participants.
Who does what
| Party | Role | What you deal with them for |
|---|---|---|
| VDA | Publishes the VDA ISA catalogue | Downloading the catalogue and white papers |
| ENX Association | Governs TISAX, approves audit providers, runs the ENX portal | Registration, fees, scope changes, sharing results, complaints |
| Audit provider | Independent firm approved by ENX that performs assessments | Quotation, kick-off, assessment, findings, reports |
| Active participant | The company being assessed (you) | Self-assessment, evidence, corrective actions |
| Passive participant | The partner who asks for and receives results (your customer) | Stating the objectives required; receiving shared results |
A company can be both active and passive. The ENX Association is a French association with offices in Boulogne-Billancourt and Frankfurt. It holds contracts with every participant and every audit provider, which is what makes mutual recognition possible.
What makes TISAX different from a certificate
- No public register of results. You may say that you participate in TISAX, but the assessment result itself may only be exchanged inside the ENX portal.
- No certificate document. The proof is the label recorded against your scope in the portal.
- Comparable results. All audit providers use the same criteria and methods, so a result from any one of them is accepted by all participants.
- Confidentiality by contract. The TISAX Participation General Terms and Conditions bind every participant to keep exchanged results confidential.
Who needs TISAX? TISAX requirements and which TISAX labels you need
Your customer's information decides whether you need TISAX and which labels
TISAX is not a legal requirement. It becomes mandatory through your customer’s purchasing conditions, a supplier portal requirement or a sourcing nomination. The trigger is almost always the protection need of what the customer entrusts to you.
Typical triggers
- A new enquiry or nomination letter that names TISAX labels and a deadline
- An OEM or Tier 1 supplier portal that asks for your TISAX Scope ID
- A request to handle drawings, CAD data, software or specifications that the customer classifies as confidential
- Just-in-time or just-in-sequence supply, where your outage stops the customer’s line
- Handling of prototype parts, test vehicles or pre-launch marketing material
- Processing the customer’s personal data on their behalf
From what you handle to the label you need
| What the customer entrusts to you | Assessment objective | Level |
|---|---|---|
| Information classified as confidential (high protection need) | Confidential | AL2 |
| Information classified as strictly confidential or secret (very high protection need) | Strictly confidential | AL3 |
| Supply where a failure would cause significant damage within a short time | High availability | AL2 |
| Supply where a failure would cause very significant damage almost immediately | Very high availability | AL3 |
| Protected components or parts that you manufacture, store or use | Proto parts | AL3 |
| Protected vehicles that you manufacture, store or use | Proto vehicles | AL3 |
| Test drives with protected vehicles on public roads or test tracks | Test vehicles | AL2 |
| Events, presentations, film or photo shoots with protected items | Proto events | AL2 |
| Personal data processed as a processor under GDPR Article 28 | Data | AL2 |
| Special categories of personal data under GDPR Article 9 | Special data | AL3 |
Since 1 January 2025, Test vehicles and Proto events are assessed at AL2. The earlier Info high and Info very high objectives could only be selected until 31 March 2024 and were replaced by the confidentiality and availability objectives.
Practical advice. Do not guess the objectives. Ask the customer’s purchasing or information security contact, in writing, which labels and which of your locations they require. Too low an objective means a second assessment. Too high an objective can add months of work and an on-site audit you did not need.
Your own suppliers
If you pass customer information or prototype work to subcontractors, the same protection need travels with it. Expect your assessor to ask how you ensure an equivalent level of security at those subcontractors, and consider asking critical ones for their own TISAX labels.
Questions to put to your customer before you register
- Which TISAX assessment objectives do you require from us, and by what date?
- Which of our locations must be covered, including any that only store or forward your information?
- How do you classify the information, parts or vehicles you will send us, and how do your classification levels map to “high” and “very high”?
- Do you accept temporary labels while corrective actions are in progress?
- Do you need the result shared with you at a particular sharing level, and what is your Participant ID?
- Do you have additional contractual security requirements beyond the TISAX label?
- Must our subcontractors hold their own labels?
Common mistakes at this stage
- Registering before the objectives are confirmed, then paying for a scope extension.
- Leaving out a location that receives customer data by email or file share.
- Assuming one customer’s requirement covers all customers. List every automotive customer and take the highest need.
- Treating the deadline in the nomination letter as the assessment date. Labels are needed by then, so the assessment must be earlier.
What is VDA ISA? The VDA ISA 6 catalogue and maturity model explained
The VDA ISA catalogue defines what "secure" means, and scores it by maturity
The VDA Information Security Assessment is a spreadsheet published by the VDA and maintained by an ENX working group. Version 6 was published in English on 16 October 2023 and has applied to TISAX assessments since 1 April 2024. The current maintenance release is ISA 6.0.3. The audit provider uses the version valid on the day you order the initial assessment.
What is in the spreadsheet
| Sheet | Purpose |
|---|---|
| Welcome and cover | Version, publication date and licence |
| Maturity levels | Definitions of levels 0 to 5 |
| Definitions | Key terms used in the requirements |
| Information Security | The main criteria catalogue, built on ISO/IEC 27001 themes |
| Prototype Protection | Physical and organisational protection of prototypes |
| Data Protection | Controls for processors of personal data |
| Results | Your scores, the result score and a spider diagram |
How each control is written
Every control is a question that begins “To what extent…”. For each one the catalogue gives an objective, then requirements in tiers:
- Must: mandatory, with no exceptions.
- Should: expected. You may deviate only with a documented reason that shows the objective is still met.
- Additional requirements for high protection needs: apply when your objectives are at the high level.
- Additional requirements for very high protection needs: apply when your objectives are at the very high level.
ISA 6 also lists the reference to ISO/IEC 27001:2022, mappings to other frameworks, example evidence and possible auditor questions for many controls. Read those columns. They show how the assessor is likely to test you.
What changed in ISA 6
- References updated to ISO/IEC 27001:2022, with a mapping to the NIST Cybersecurity Framework.
- Operational technology brought explicitly into scope, with requirements aligned to IEC 62443-2-1.
- A new control on approved software (1.3.4), a split of incident handling into reporting (1.6.1) and management (1.6.2), and a new control on crisis situations (1.6.3).
- New controls on IT service continuity planning (5.2.8) and backup and recovery (5.2.9), replacing the earlier control 3.1.2.
- The single information security objective split into confidentiality and availability objectives.
- The data protection catalogue rebuilt, growing from 4 controls to 12.
The maturity model
| Level | Name | Meaning in the ISA | What it looks like in practice |
|---|---|---|---|
| 0 | Incomplete | No process, or one that is not followed or not suitable | “We deal with it when it happens” |
| 1 | Performed | Followed, but undocumented or incompletely documented | People know what to do; nothing is written down |
| 2 | Managed | Achieves its objectives; documentation and evidence of implementation exist | A procedure exists and records show it is used |
| 3 | Established | A standard process, integrated into the overall system, with dependencies documented and sustained use over time | Owners, interfaces, records over several cycles, periodic review |
| 4 | Predictable | Monitored with key figures; limit values trigger action | KPIs with thresholds and documented responses |
| 5 | Optimising | Predictable, with continual improvement actively resourced | A funded improvement programme driven by the KPIs |
How the result is calculated
- You score each applicable control from 0 to 5, or mark it not applicable with a reason.
- Any score above 3 is cut back to 3.
- The result score is the average of the cut-back scores. The maximum is 3.0.
- A result score more than 10% below the maximum gives an overall minor non-conformity. More than 30% below gives a major non-conformity.
Worked example. Suppose 40 controls apply. You score 36 at level 3 or above, three at level 2 and one at level 1. The cut-back total is (36 x 3) + (3 x 2) + (1 x 1) = 115, and the result score is 115 / 40 = 2.875. That is about 4% below 3.0, so the overall score is within tolerance. The four controls below target are still findings, and each needs a corrective action. A score of 3.0 does not guarantee a pass either, because the assessor may judge a control differently from you.
VDA ISA 6 checklist: Information Security controls and audit evidence
The Information Security module: what each control asks and what assessors look for
This chapter summarises the controls of the Information Security module in ISA 6. Topics are paraphrased; use the catalogue itself for the exact wording and requirements. The evidence column lists what we typically see assessors request.
Chapter 1: Policies and organisation
| Control | Topic | Typical evidence |
|---|---|---|
| 1.1.1 | Information security policies exist, are approved and communicated | Approved policy, review record, communication proof |
| 1.2.1 | Information security is managed within the organisation (the ISMS) | ISMS scope, objectives, management review minutes |
| 1.2.2 | Responsibilities are defined and assigned | Role descriptions, appointment letters, organisation chart |
| 1.2.3 | Information security is considered in projects | Project checklist or stage-gate with security classification |
| 1.2.4 | Responsibilities between you and external IT service providers are defined | Responsibility matrix, service contracts |
| 1.3.1 | Information assets are identified and recorded | Asset inventory with owners |
| 1.3.2 | Information assets are classified and handled accordingly | Classification scheme mapped to customer levels, handling rules |
| 1.3.3 | Only evaluated and approved external IT services are used | Service register, risk assessments, approvals |
| 1.3.4 | Only evaluated and approved software is used | Approved software list, installation controls |
| 1.4.1 | Information security risks are managed | Risk method, register, treatment plan, risk owner approvals |
| 1.5.1 | Compliance with information security is ensured in procedures and processes | Internal control checks, compliance reviews |
| 1.5.2 | The ISMS is reviewed by an independent party | Internal audit programme and reports |
| 1.6.1 | Security events and observations are reported | Reporting channel, awareness material, sample reports |
| 1.6.2 | Reported events are processed and incidents managed | Incident procedure, classification, incident log, lessons learned |
| 1.6.3 | The organisation is prepared for crisis situations | Crisis plan, crisis team, exercise records |
Chapter 2: Human resources
| Control | Topic | Typical evidence |
|---|---|---|
| 2.1.1 | Suitability of employees for sensitive work is verified | Screening procedure, sample records |
| 2.1.2 | Staff are contractually bound to information security and confidentiality | Employment clauses, signed undertakings |
| 2.1.3 | Staff are made aware of and trained in the risks of handling information | Training plan, completion records, phishing exercises |
| 2.1.4 | Mobile and remote working is regulated | Remote working policy, VPN and device controls |
Chapter 3: Physical security
| Control | Topic | Typical evidence |
|---|---|---|
| 3.1.1 | Security zones are managed to protect information assets | Zone concept, access lists, visitor logs, site walk |
| 3.1.3 | Supporting assets are handled securely across their life cycle | Procedures for transport, repair, reuse and disposal; disposal certificates |
| 3.1.4 | Mobile IT devices and mobile data storage devices are managed | Encryption status, device management reports, media rules |
Control 3.1.2 of the previous version was superseded in ISA 6. Its content moved to controls 1.6.3, 5.2.8 and 5.2.9.
Chapter 4: Identity and access management
| Control | Topic | Typical evidence |
|---|---|---|
| 4.1.1 | Identification means such as badges, keys and tokens are managed | Issue and return records, lost badge process |
| 4.1.2 | User access to IT services and systems is secured | Authentication standard, multi-factor configuration |
| 4.1.3 | User accounts and login information are managed and applied securely | Joiner, mover and leaver records; password rules; privileged account list |
| 4.2.1 | Access rights are assigned and managed | Authorisation concept, approval records, periodic access reviews |
Chapter 5: IT security and cyber security
| Control | Topic | Typical evidence |
|---|---|---|
| 5.1.1 | Use of cryptographic procedures is managed | Cryptography standard, key management records |
| 5.1.2 | Information is protected during transfer | Approved transfer channels, encryption settings |
| 5.2.1 | Changes are managed | Change procedure, tickets with risk assessment and approval |
| 5.2.2 | Development and test environments are separated from operational ones | Environment diagram, access separation |
| 5.2.3 | IT systems are protected against malware | Endpoint protection coverage, alert handling |
| 5.2.4 | Event logs are recorded and analysed | Logging standard, log review records, alert rules |
| 5.2.5 | Vulnerabilities are identified and addressed | Scan reports, patch records, remediation timelines |
| 5.2.6 | IT systems and services are technically checked | Penetration tests, configuration audits, follow-up |
| 5.2.7 | The network is managed and controlled | Network diagram, segmentation, firewall rule reviews |
| 5.2.8 | Continuity planning for IT services is in place | Continuity plans, recovery objectives, test records |
| 5.2.9 | Backup and recovery of data and IT services is ensured | Backup concept, job reports, restore test records |
| 5.3.1 | Information security is considered in new or further developed IT systems | Security requirements in specifications, acceptance tests |
| 5.3.2 | Requirements for network services are defined | Service descriptions, service level agreements |
| 5.3.3 | Return and secure removal of information assets from external IT services is regulated | Exit clauses, deletion confirmations |
| 5.3.4 | Information in shared external IT services is protected | Tenant separation evidence, provider attestations |
Chapter 6: Supplier relationships
| Control | Topic | Typical evidence |
|---|---|---|
| 6.1.1 | Information security is ensured among contractors and cooperation partners | Supplier risk assessment, contract clauses, supplier labels or audits |
| 6.1.2 | Non-disclosure is contractually agreed for the exchange of information | NDA register, signed NDAs |
Chapter 7: Compliance
| Control | Topic | Typical evidence |
|---|---|---|
| 7.1.1 | Compliance with regulatory and contractual provisions is ensured | Register of legal and contractual requirements, reviews |
| 7.1.2 | Protection of personal data is considered in information security | Privacy policy, data protection roles, processing records |

Additional focus when availability objectives apply
The availability objectives bring your production and operational technology into the assessment. Expect questions on:
- Named responsibility for OT security and an inventory of OT assets
- Risk assessment that covers production systems, not only office IT
- Segmentation between office IT and the shop floor, with controlled remote access for machine vendors
- Hardening, patching or compensating measures for legacy controllers
- Background checks and competence of staff and service providers with OT access
- Backup of controller programs and recipes, with tested recovery
- Continuity plans that state how quickly production can restart
TISAX prototype protection requirements
The Prototype Protection module is assessed with a walk through your site
The Prototype Protection module applies when you handle vehicles, components or parts that the customer has classified as requiring protection, or when you run test drives and events with them. The commissioning department of the customer decides the protection class.
Physical and environmental security (8.1)
| Control | Topic | What the assessor checks |
|---|---|---|
| 8.1.1 | A security concept for the property exists | Documented concept with layout and responsibilities |
| 8.1.2 | Perimeter security prevents unauthorised access | Fencing, gates, lighting, guarding or monitoring |
| 8.1.3 | The outer skin of buildings prevents removal or observation | Windows, doors, roof lights, loading bays |
| 8.1.4 | View and sight protection is ensured in defined areas | Screens, frosted glazing, covered transport routes |
| 8.1.5 | Protection against unauthorised entry is regulated through access control | Badge systems, key control, access logs |
| 8.1.6 | Premises are monitored for intrusion | Alarm system, monitoring arrangements, alarm response plan |
| 8.1.7 | Visitor management is documented | Registration, escort, NDA, badge return |
| 8.1.8 | On-site client segregation exists | Separation between projects of different customers |
Organisational requirements (8.2)
| Control | Topic | What the assessor checks |
|---|---|---|
| 8.2.1 | Non-disclosure obligations exist for staff and third parties | Signed undertakings per project |
| 8.2.2 | Requirements for commissioning subcontractors are known and fulfilled | Customer approval, flow-down of requirements |
| 8.2.3 | Staff and project members are trained in handling prototypes | Training content and attendance |
| 8.2.4 | Security classifications of the project and resulting measures are known | Project briefing, classification list |
| 8.2.5 | A process governs access to security areas | Authorisation procedure, periodic review |
| 8.2.6 | Rules exist for image recording and handling of image material | Photo permit process, storage of images |
| 8.2.7 | Carrying and use of mobile video and photography devices is regulated | Phone policy, lockers, signage, enforcement |
Handling of vehicles, components and parts (8.3), trial vehicles (8.4), events and shootings (8.5)
| Control | Topic | What the assessor checks |
|---|---|---|
| 8.3.1 | Transports are arranged according to the customer’s security requirements | Covered transport, approved logistics partners, transport records |
| 8.3.2 | Vehicles, components and parts are parked and stored securely | Locked, screened storage with inventory |
| 8.4.1 | Camouflage is applied as specified by the customer | Camouflage instructions and checks |
| 8.4.2 | Test and trial grounds are protected | Approved grounds, access rules |
| 8.4.3 | Protective measures for test drives on public roads are observed | Route planning, behaviour rules, incident reporting |
| 8.5.1 | Security requirements for presentations and events are known | Event security concept, guest management |
| 8.5.2 | Protective measures for film and photo shootings are observed | Location security, handling of footage |

Plan the physical work first. Partitions, access control, alarm systems and CCTV carry procurement and installation lead times. Scope and order them in the first month. Check local privacy law before installing cameras, and document retention periods for recordings.
TISAX data protection: the Data and Special data labels
The Data Protection module applies only if you process personal data for a customer
Select the Data or Special data objectives only when you act as a processor of your customer’s personal data within the meaning of Article 28 of the EU General Data Protection Regulation. Typical cases are HR and payroll services, customer service centres, connected vehicle data services, marketing agencies and IT providers hosting customer systems.
ISA 6 rebuilt this module into 12 controls. They cover, in summary:
| Theme | What is expected |
|---|---|
| Data protection organisation | A data protection policy, a named function or officer, and management reporting |
| Processing on instruction | Contracts with the controller, documented instructions and proof that you follow them |
| Records of processing | A current record of processing activities carried out for each controller |
| Confidentiality of staff | Commitments and training for everyone who handles the data |
| Technical and organisational measures | Measures matched to the risk, linked to the Information Security module |
| Sub-processors | Controller approval, equivalent contracts and oversight |
| International transfers | A lawful transfer mechanism and transfer assessments where data leaves the EU |
| Data subject requests | A process to support the controller within agreed times |
| Incident notification | Prompt notification of personal data breaches to the controller |
| Deletion and return | Deletion or return at the end of the contract, with evidence |
Special data applies the same themes with stricter measures, because health, biometric and similar categories carry higher risk. It is assessed at AL3.
For suppliers in India, this module overlaps with duties under the Digital Personal Data Protection Act, 2023. A single privacy programme that maps both sets of obligations avoids duplicate work.
TISAX assessment levels (AL1, AL2, AL3) and TISAX labels
Assessment objectives fix the labels, the level and the method

The three assessment levels
| Method | AL1 | AL2 | AL3 |
|---|---|---|---|
| Self-assessment | Yes | Yes | Yes |
| Evidence | Not checked | Plausibility check | Thorough verification |
| Interviews | None | By web conference | In person, on site |
| On-site inspection | None | On request | Yes |
AL1 only confirms that a self-assessment exists and is not used for TISAX labels. An AL2 result cannot be upgraded to AL3 without a new initial assessment, so choose correctly at the start. Some audit providers also offer a variant often called AL2.5, a full remote assessment.
If on-site work for AL3 is temporarily impossible or unreasonably costly, the audit provider may use a video-supported remote method. It must be recorded as a minor non-conformity, and an on-site follow-up is required once it becomes possible.
Labels and their relationships
- Passing an objective gives you the label of the same name.
- Higher objectives include lower ones. Strictly confidential includes Confidential; Very high availability includes High availability.
- Proto vehicles also grants the Proto parts label.
- Labels are visible in the ENX portal, not in the assessment report.
Combining objectives
Most suppliers combine objectives, for example Confidential plus High availability, or Strictly confidential plus Proto parts. The assessment is carried out at least at the highest level among the selected objectives, and all criteria of every selected objective are assessed.
TISAX scope: standard scope, multiple locations and group assessments
Scope decisions made at registration shape cost, risk and renewal
The standard scope
Well over 99% of participants use the standard scope. Its text is fixed. It covers all processes, procedures and resources under the responsibility of the assessed organisation that are relevant to the security of the protection objects, at the listed locations. Other participants generally accept only standard-scope results. Custom scopes exist for special cases and need ENX involvement.
Your TISAX scope may be smaller than your ISMS scope, but it must lie within it.
One scope or several
| Option | Advantages | Disadvantages | Suits |
|---|---|---|---|
| One scope for all locations | One assessment, one report, one expiry date, lower cost | One failing location fails the whole scope | Centrally managed groups with uniform practices |
| One scope per location or region | A weak site does not block the others; flexible timing | More assessments, more fees, more administration | Decentralised groups, sites with different objectives |
Simplified group assessment
Organisations with at least three locations in a scope and a centrally organised, well-functioning ISMS can consider a simplified group assessment. The central functions and a sample of locations receive the full assessment, which reduces effort at the remaining sites. The initial effort is higher, and the model pays off as the number of locations grows. The rules are in a separate ENX document, and your audit provider will check eligibility.
Location data to prepare
For each location, the portal asks for the name, address, D-U-N-S number, location type, industry, employee numbers, existing certifications and whether there is passive site protection. Collect this before you start the registration.
TISAX vs ISO 27001: mapping, differences and gaps
ISO/IEC 27001 gives you the foundation; plan separately for seven gaps
The transition to ISO/IEC 27001:2022 ended on 31 October 2025, and certificates to the 2013 edition are no longer valid. The current standard has 93 Annex A controls in four themes: organisational (37), people (8), physical (14) and technological (34).

Side by side
| Dimension | ISO/IEC 27001:2022 | TISAX (VDA ISA 6) |
|---|---|---|
| Owner | ISO and IEC | VDA (catalogue) and ENX Association (mechanism) |
| Nature | Certifiable management system standard | Assessment and exchange mechanism; results are labels |
| Who assesses | Accredited certification body | ENX-approved audit provider |
| Requirements | Clauses 4 to 10 plus Annex A controls selected by risk | Fixed catalogue filtered by assessment objectives |
| Scoring | Conformity and nonconformities | Maturity 0 to 5 per control, target 3 |
| Scope | Defined by the organisation | Standard scope at registered locations |
| Sector content | Generic | Prototypes, OT availability, processor privacy controls |
| Validity | Three years with annual surveillance | Three years without surveillance |
| Sharing | Certificate sent to anyone | Exchanged in the ENX portal with named participants |
Indicative mapping of ISA chapters to Annex A
The catalogue contains its own reference column, which is authoritative. The table below is a planning aid.
| ISA chapter | Related ISO/IEC 27001:2022 clauses and controls |
|---|---|
| 1 Policies and organisation | Clauses 4 to 10; A.5.1 to A.5.4, A.5.8 to A.5.13, A.5.23 to A.5.30, A.5.35, A.5.36 |
| 2 Human resources | A.6.1 to A.6.4, A.6.7 |
| 3 Physical security | A.7.1 to A.7.4, A.7.8 to A.7.10, A.7.14, A.8.1 |
| 4 Identity and access management | A.5.15 to A.5.18, A.8.2, A.8.3, A.8.5 |
| 5 IT security and cyber security | A.5.14, A.8.7, A.8.8, A.8.13 to A.8.16, A.8.20 to A.8.22, A.8.24 to A.8.29, A.8.31, A.8.32, A.8.34 |
| 6 Supplier relationships | A.5.19 to A.5.22, A.6.6 |
| 7 Compliance | A.5.31 to A.5.34 |
The seven gaps
- Maturity evidence. ISO audits sample. TISAX scores every control and expects records of monitoring and review for each.
- Should requirements and add-ons. Requirements for high and very high protection go beyond ISO 27002 guidance in areas such as mobile devices, removable media and external IT services.
- Prototype protection. No ISO equivalent exists.
- OT and availability. Segmentation, hardening and recovery of production systems are assessed directly.
- Processor privacy controls. The Data objectives test Article 28 obligations directly.
- Scope. A narrow ISO scope must be widened to the whole location.
- Customer-specific requirements. Many customers add contractual security rules on top of the label.
A combined approach
Build one control framework with the ISA as the detailed layer and ISO/IEC 27001 as the management system layer. Keep one risk register, one evidence library and one internal audit programme. Schedule the ISO surveillance audit and the TISAX renewal so that evidence collected for one serves the other.
TISAX certification process step by step: registration, assessment, exchange
The assessment process runs in three steps: register, assess, exchange
Step 1: Registration
- Read the General Terms and Conditions. You accept the TISAX Participation General Terms and Conditions during registration. ENX does not accept other terms, so obtain legal clearance beforehand if your company requires it.
- Create the participant. Enter company details and at least one main contact. ENX recommends naming an alternate for every contact, because replacing the last valid contact requires proof of legal representation.
- Register the scope. Choose the standard scope, add locations, select assessment objectives and give the scope an internal name, ideally with the year.
- Decide on publication. You can set publication and sharing levels now or later. Permissions cannot be revoked once given.
- Pay the fee. The scope becomes usable once ENX has approved it and payment is arranged.
A first registration with one scope and one location takes at least 20 minutes and is best completed in one sitting. A registration not completed within 90 days expires.
Identifiers you receive
| Identifier | Use |
|---|---|
| Participant ID | Identifies your company; your customers use it to find you |
| Scope ID | Identifies the assessment scope; quote it to audit providers and customers |
| Location ID | Six characters beginning with L; identifies each site |
| Assessment ID | Issued for each assessment within the scope |
Scope statuses: Incomplete, Awaiting your order, Awaiting ENX approval, Awaiting your payment, Registered, Active and Expired.
The ENX fee. The fee depends on the number of locations in the scope. ENX’s published price list shows EUR 405 per location per scope under the default assessment-based model, with discounts of 10% per location for 5 to 9 locations and 20% for 10 to 14. Adding locations increases the fee, and removing them gives no refund. Check the current price list in the ENX download centre before budgeting.
Step 2: Assessment
Choose an audit provider. Only providers contracted by ENX may assess. Request offers once your scope is registered and attach the TISAX Scope Excerpt. Compare availability, travel cost, language and what the offer includes. The initial assessment and the corrective action plan assessment are usually included; follow-up assessments are often quoted later. Contact providers early, because their calendars fill up.
Complete the self-assessment. For each applicable control, record the maturity level, a description of how you implement it and references to your documents. Aim for every control at target before you submit.
Kick-off meeting. Usually a conference call covering participants, scope, conflicts of interest, responsibilities, timing and complaint contacts. The time from kick-off to delivering the self-assessment is typically one to three months, and sometimes six.
The assessment types
| Type | Purpose | Outcome |
|---|---|---|
| Initial assessment | Document review, interviews and, for AL3, on-site verification | Assessment report with findings; ends with a closing meeting |
| Corrective action plan assessment | Review of your plan to resolve findings | Approval of the plan; temporary labels where the overall result is minor non-conform |
| Follow-up assessment | Verification that findings are closed | Final result; labels issued when conform |
Corrective action plans. For each non-conformity, state the finding, its root cause and one or more corrective actions with implementation dates. Where a finding creates a critical risk, add compensating measures until the action is complete. Periods start on the day the initial assessment concluded. More than three months needs justification, more than six needs evidence that faster implementation is not possible, and nothing may exceed nine months.
Temporary labels. Issued when the overall result is minor non-conform and the plan is approved. They are valid for up to nine months after the closing meeting of the initial assessment. Request the follow-up assessment well before they expire.
Overall results: conform, minor non-conform or major non-conform. A major non-conform result gives no labels until the major findings are resolved.
Step 3: Exchange
- Publishing makes your result visible to all TISAX participants and is allowed only for conform results. ENX recommends the option “A + Labels”.
- Sharing gives a named participant access, using their Participant ID, at a level you choose. Sharing is possible even before the result is conform.
- Sharing levels run from A to E and reveal progressively more, from participant and assessment information up to detailed results. The lower levels are visible in the portal; the higher levels are sent by the audit provider to your partner’s contact.
- Some customers synchronise automatically with the ENX portal and recognise only results shared with them, not publications. Share explicitly with each customer.
- The scope status must be Active before you can share.
How to reach VDA ISA maturity level 3: documents, evidence and KPIs
Reaching maturity level 3 means building records, owners and reviews
Most organisations that struggle already have the technology. What they lack is proof that each process is defined, owned, followed and reviewed.

The documentation set
| Area | Documents usually needed |
|---|---|
| Governance | Information security policy; ISMS scope; roles and responsibilities; objectives and KPIs; management review procedure |
| Risk | Risk management method; risk register; treatment plan; statement of applicability or ISA applicability record |
| Assets | Asset inventory; classification and handling policy; acceptable use policy; approved software and external services registers |
| People | Screening procedure; confidentiality undertakings; awareness and training plan; remote working policy; disciplinary process |
| Physical | Zone concept; access control procedure; visitor procedure; equipment transport, repair and disposal procedure |
| Access | Authorisation concept; joiner, mover and leaver procedure; password and authentication standard; privileged access procedure |
| Operations | Change management; malware protection; logging and monitoring; vulnerability and patch management; backup and restore; network security standard; cryptography standard |
| Development | Secure development and acquisition requirements; environment separation; test data rules |
| Suppliers | Supplier security procedure; contract clauses; NDA template; supplier register and assessments |
| Incidents and continuity | Reporting procedure; incident management plan; crisis plan; IT service continuity plans; exercise schedule |
| Compliance | Register of legal and contractual requirements; internal audit programme; data protection policy |
| Prototype protection | Security concept; photo and device policy; project briefing template; transport and storage rules |
The evidence calendar
Level 3 needs sustained use. Build a calendar so that evidence accumulates before the assessment.
| Frequency | Activities that generate evidence |
|---|---|
| Continuous | Incident tickets, change tickets, visitor logs, access requests, patch records |
| Monthly | Vulnerability scans, backup reports, privileged account review, KPI report |
| Quarterly | User access recertification, risk register review, restore test, supplier review, firewall rule review |
| Half-yearly | Awareness campaign, phishing exercise, continuity or crisis exercise |
| Yearly | Policy review, internal audit, management review, penetration test, supplier reassessment, asset inventory check |
Start this calendar at least three to four months before the assessment. An assessor will not accept a process as established on the strength of one record.
Ownership
| Activity | Top management | CISO or ISMS lead | IT and OT | HR | Facilities | Process owners |
|---|---|---|---|---|---|---|
| Approve policy and resources | A | R | C | C | C | I |
| Risk assessment and treatment | A | R | C | C | C | R |
| Access management | I | A | R | R | I | C |
| Physical and prototype security | I | A | C | I | R | R |
| Awareness and screening | I | A | C | R | I | I |
| Incident and crisis management | A | R | R | C | C | C |
| Internal audit and management review | A | R | C | C | C | C |
R = responsible, A = accountable, C = consulted, I = informed.
Example KPIs
- Share of staff who completed awareness training in the last 12 months
- Share of critical vulnerabilities remediated within the defined time
- Share of leaver accounts disabled within one working day
- Share of user access reviews completed on schedule
- Backup success rate and number of successful restore tests per quarter
- Number of incidents by category and mean time to contain
- Share of critical suppliers with a current security assessment or label
TISAX technical requirements: the IT and OT security baseline
A sound technical baseline removes most of the hard findings

| Domain | Baseline that assessors expect |
|---|---|
| Identity | Unique named accounts; no shared administrator accounts; multi-factor authentication for remote and privileged access; prompt removal of leavers |
| Endpoints | Managed devices; full disk encryption on laptops; endpoint protection with central alerting; controlled local administrator rights |
| Mobile and media | Mobile device management; encrypted removable media or a ban on them; rules for private devices |
| Email and transfer | Encrypted transfer channels for customer data; approved file exchange platforms; no personal cloud storage |
| Network | Documented topology; segmentation of office, server, guest and production networks; reviewed firewall rules; secured wireless |
| Remote access | VPN or equivalent with multi-factor authentication; controlled and logged vendor access |
| Servers and cloud | Hardening standards; patching within defined times; assessed and contracted cloud services; tenant separation |
| Logging | Central collection of security-relevant logs; protection against tampering; defined review and alerting |
| Vulnerabilities | Regular scanning; risk-based remediation times; periodic penetration tests of exposed systems |
| Backup | Defined backup scope; offline or immutable copies; documented restore tests |
| Development | Separated environments; no production data in test without protection; security requirements in specifications |
| OT | Asset inventory; segmentation from IT; compensating measures for systems that cannot be patched; backups of controller programs |
Handling customer information
- Map the customer’s classification levels to your own, and label customer information accordingly.
- Restrict access to project teams with a need to know, and review that access quarterly.
- Agree transfer channels with the customer and do not use others.
- Define retention, and return or delete information at the end of the project with evidence.
Common TISAX audit findings and how to avoid them
Most delays come from ten predictable weaknesses
| Area | Typical finding | Root cause | What fixes it |
|---|---|---|---|
| Maturity evidence | Policies exist without records of use or review | Documents written shortly before the audit | Evidence calendar with owners and retained records |
| Risk management | Register out of date; OT and suppliers missing | Risk treated as a one-off exercise | Quarterly reviews with risk owner sign-off |
| Classification | Customer information not labelled or handled per customer level | No mapping to customer schemes | Mapped scheme, handling rules, staff briefing |
| Access | Shared accounts; no recertification; slow leaver removal | No link between HR and IT processes | HR-triggered workflow and quarterly reviews |
| External IT services | Cloud tools used without assessment | Purchases made outside IT | Service register and approval before use |
| Mobile devices | Unencrypted laptops and media | No device management | Encryption, MDM and media control |
| OT | Flat network; unmanaged vendor access | OT owned by production without security input | Segmentation, controlled remote access, named OT owner |
| Continuity | Backups never restored; plans untested | Focus on backup jobs, not recovery | Scheduled restore tests and exercises |
| Suppliers | No flow-down of requirements | Purchasing unaware of security clauses | Standard clauses, supplier register, periodic assessment |
| Awareness | Generic content; no completion proof | Training treated as a formality | Role-based training with tracked completion |
Assessment-day pitfalls
- Interviewees who cannot explain their own process. Brief control owners and rehearse.
- Evidence scattered across mailboxes. Build an indexed evidence folder per control.
- Self-assessment descriptions that restate the question. Describe what you do, who does it and where the record is.
- Scores claimed at 3 with only a few weeks of records. Score honestly and plan the corrective action.
- Prototype zones where phones are in use during the site walk. Enforce the rules every day, not on audit day.
How long does TISAX take and how much does TISAX cost?
Plan for six months with an ISMS in place, and up to twelve without
| Starting point | Target labels | Indicative time to assessment |
|---|---|---|
| ISO/IEC 27001:2022 certified, mature ISMS | Confidential, High availability (AL2) | 4 to 6 months |
| ISO/IEC 27001 certified, OT in scope | Very high availability or Strictly confidential (AL3) | 6 to 9 months |
| No formal ISMS | Any AL2 label | 8 to 12 months |
| Prototype handling site | Proto parts or Proto vehicles (AL3) | Add 2 to 3 months for physical works |
These ranges are planning assumptions based on our experience, not commitments. The drivers are management attention, the number of locations and how quickly operating evidence can accumulate.
Phase plan
| Phase | Weeks | Key activities | Deliverables |
|---|---|---|---|
| 1 Mobilise and scope | 1 to 4 | Confirm objectives; appoint sponsor and lead; register with ENX; request audit provider offers | Project charter; Scope ID; audit provider shortlist |
| 2 Gap assessment | 3 to 8 | ISA self-assessment; ISO mapping; site walk; OT review | Scored ISA; gap list; remediation plan and budget |
| 3 Remediate | 6 to 20 | Policies and procedures; technical fixes; physical works; training; start evidence calendar | Document set; implemented controls; evidence library |
| 4 Operate and verify | 12 to 22 | Internal audit; management review; exercises; KPI reporting | Audit report; review minutes; updated ISA scores |
| 5 Pre-assessment | 20 to 23 | Mock interviews; evidence index check; final site walk | Readiness report; final self-assessment |
| 6 Assessment | 24 onward | Kick-off; initial assessment; closing meeting | Assessment report |
| 7 Close and exchange | Up to 9 months after | Corrective action plan; follow-up; share results | Labels in the ENX portal |
What to budget for
| Cost element | Notes |
|---|---|
| ENX registration fee | Per location per scope, as per the ENX price list |
| Audit provider fees | Depend on locations, objectives and level; AL3 adds on-site days and travel. Obtain at least two offers |
| Internal effort | Project lead, control owners, IT and OT, facilities, HR. Usually the largest element |
| Technical remediation | Device management, multi-factor authentication, segmentation, logging, backup |
| Physical works | Access control, partitions, alarms, CCTV for prototype sites |
| Advisory support | Gap assessment, documentation, pre-assessment, corrective action support |
| Ongoing operation | Internal audit, testing, training and tools for three years |
Ways to keep the cost under control
- Confirm objectives and scope before spending on anything else.
- Reuse what ISO/IEC 27001 already gives you, and map it to the ISA instead of rewriting it.
- Fix process and evidence gaps first. They cost little and account for most findings.
- Group locations sensibly, and test eligibility for a simplified group assessment.
- Book the audit provider early to avoid premium dates and repeated travel.
- Close findings quickly. Every follow-up assessment adds fees.
Maintaining and renewing your TISAX label
The label lasts three years only if the system keeps running
There are no surveillance audits in TISAX. That makes the period between assessments the most common point of failure at renewal.
Keep the system alive
- Run the evidence calendar without interruption.
- Hold the internal audit and management review every year.
- Track every corrective action to closure and verify its effectiveness.
- Report KPIs to management at least quarterly.
Manage change
| Change | What to do |
|---|---|
| Company name change | Submit a change request in the ENX portal |
| Street renamed by an authority | Submit an address change request |
| Relocation | Create the new location in the portal, inform your audit provider and arrange a scope extension assessment |
| Additional location or objective | Request a scope extension assessment during the validity of your labels |
| Change of contacts | Update contacts promptly and keep an alternate for each |
A scope extension assessment must be done by the same audit provider and does not extend the original validity period. A significant change, such as a move, can shorten label validity if it is not handled.
Renewal
Renewal repeats the process: register a new scope, get assessed and share the results. Register the new scope before contacting the audit provider, because a new Scope ID is required. Reuse your existing contacts and location records. ENX advises starting at least one year before expiry if labels must remain valid without a gap.
Complaints
If you disagree with an audit provider, escalate in order: the auditor, the provider’s TISAX lead, the provider’s quality management, and then ENX. Have your Participant ID, Scope ID, Assessment ID and the specific control and finding to hand.
TISAX in India: guidance for Indian automotive suppliers
Indian suppliers should plan for multi-site scopes, shop-floor OT and privacy alignment

India’s automotive engineering, component and IT services base increasingly serves German, European and Japanese manufacturers and their Tier 1 suppliers. For these relationships a TISAX label is often a condition for receiving design data or a sourcing nomination.
- Multi-site groups. Decide early between one scope and several, and assess eligibility for a simplified group assessment if you have three or more locations with a central ISMS.
- Engineering service centres. Offshore development centres usually need Confidential or Strictly confidential. Expect scrutiny of project segregation, remote access from customer networks and return or deletion of data.
- Shop-floor OT. Many plants run legacy controllers on flat networks. Budget for segmentation and compensating controls before selecting an availability objective.
- Shared premises. In multi-tenant buildings and industrial estates, show how you control the perimeter, reception and common areas that you do not own.
- Contract staff. Apply the same screening, undertakings and training to contract labour and security guards as to employees.
- Privacy. Align processor controls for the Data objectives with the Digital Personal Data Protection Act, 2023.
- Audit logistics. AL3 requires in-person interviews in a language the auditor can work in. Confirm auditor availability, language and travel early.
TISAX readiness checklist
Checklists for the programme, the documents and the assessment day
Programme readiness checklist
- Customer’s required objectives and locations confirmed in writing
- Executive sponsor and programme lead appointed
- General Terms and Conditions reviewed; participant and scope registered
- ENX fee paid; scope status Registered
- Audit provider selected and dates reserved
- ISA self-assessment completed with honest scores
- Remediation plan with owners, dates and budget approved
- Documentation set approved and communicated
- Evidence calendar running for at least three months
- Internal audit and management review completed
- Crisis or continuity exercise and restore test completed
- Supplier assessments completed for critical subcontractors
- Physical and prototype measures installed and in daily use
- Control owners briefed and mock interviews held
- Evidence folder indexed by control number
Assessment day checklist
- Agenda agreed with the audit provider; rooms and connections tested
- Control owners available for their slots, with deputies
- Evidence folder accessible to presenters
- Site walk route prepared; areas in normal working order
- Visitor process applied to the auditors themselves
- A note-taker assigned to record every request and finding
- Daily wrap-up meetings planned
After the assessment
- Findings logged with root cause analysis
- Corrective action plan submitted with dates and compensating measures
- Follow-up assessment scheduled within the nine-month limit
- Results shared with each customer using their Participant ID
- Renewal reminder set at least 12 months before expiry
TISAX FAQs
Frequently asked questions
Is TISAX a certification? No. It produces assessment results and labels exchanged through the ENX portal. You may mention your participation, but you may not publish the result outside the portal.
Is TISAX mandatory? Not by law. It becomes mandatory through customer requirements.
Does ISO/IEC 27001 exempt us? No. It reduces the effort, but the TISAX assessment is still required where a customer asks for a label.
Can our consultant be our auditor? No. An audit provider that has consulted for you cannot assess you.
Which version of the ISA applies? The version valid when you order the initial assessment. By agreement with the audit provider, a newer version published before the assessment starts may be used.
Can we limit the scope to one department? In practice no. Almost all participants use the standard scope, and customers expect it.
What if we cannot meet a should requirement? Document why, show how the objective is still met, and record the decision as a risk decision approved by the risk owner.
What happens if we have findings? You submit a corrective action plan. With an overall minor non-conform result you can receive temporary labels. All actions must be complete within nine months.
How long are labels valid? Three years, shorter if the scope changes significantly.
Are there surveillance audits? No. You remain responsible for keeping the system effective.
How do customers see our result? You share it with their Participant ID in the ENX portal, at the level you choose.
Can a customer without its own assessment receive results? Yes. A partner can register as a participant and receive shared results.
Can we change audit provider at renewal? Yes. Only scope extension assessments must stay with the original provider.
We handle no prototypes and no personal data. Which labels apply? Usually Confidential, and High availability if your outage would stop customer production. Confirm with your customer.
Do we need tools? No specific tool is required. Many organisations manage well with the ISA spreadsheet, a ticket system and a document repository, provided that records are kept consistently.
How much does TISAX cost? There are three cost blocks: the ENX registration fee per location, the audit provider’s fee and your internal and remediation effort. ENX’s published price list shows EUR 405 per location per scope under the default model. Audit provider fees depend on the number of locations, the objectives and whether the assessment is AL2 or AL3, so get at least two offers. For most suppliers, internal effort and remediation are the largest costs.
How long does TISAX certification take? A supplier with a mature ISO 27001 ISMS can usually reach the TISAX assessment in four to six months for AL2 labels. Without a formal ISMS, plan for eight to twelve months. After the assessment, findings must be closed within nine months.
What is the difference between TISAX AL2 and AL3? AL2 is a plausibility check of your self-assessment and evidence, with interviews by web conference. AL3 is a thorough verification with on-site inspection and in-person interviews. Your assessment objectives decide which level applies.
Is TISAX required for Indian automotive suppliers? Not by Indian law. It becomes a requirement when a customer, usually a European OEM or Tier 1, asks for a TISAX label before sharing confidential data, prototypes or production schedules.
What is the VDA ISA Excel? It is the spreadsheet form of the VDA Information Security Assessment catalogue. You use it for the TISAX self-assessment, scoring each control from 0 to 5 and describing how you meet it.
Who can perform a TISAX assessment? Only audit providers approved by the ENX Association. ENX publishes the list. A provider that has consulted for you cannot assess you.
Is there a TISAX checklist? The VDA ISA catalogue is the authoritative checklist. Chapter 18 of this guide gives a programme readiness checklist and an assessment-day checklist you can use alongside it.
TISAX and VDA ISA glossary
Glossary
| Term | Meaning |
|---|---|
| Active participant | The organisation that is assessed |
| AL | Assessment level (1, 2 or 3) |
| Assessment objective | The protection goal selected at registration; determines controls and level |
| Audit provider | A firm approved by ENX to perform TISAX assessments |
| CAP | Corrective action plan |
| ENX Association | The organisation that governs TISAX and runs the ENX portal |
| ENX portal | The platform for registration and exchange of results |
| ISA | Information Security Assessment, the VDA’s requirements catalogue |
| ISMS | Information security management system |
| Label | Proof in the ENX portal that an assessment objective was achieved |
| Maturity level | A score from 0 to 5 for how well a process is established |
| OT | Operational technology, such as production control systems |
| Passive participant | A partner that receives assessment results |
| Protection need | Normal, high or very high, usually set by the customer |
| Scope ID | The identifier of your registered assessment scope |
| SGA | Simplified group assessment for multi-site organisations |
| Standard scope | The fixed scope description used by almost all participants |
| TISAX | Trusted Information Security Assessment Exchange |
| VDA | Verband der Automobilindustrie, the German Association of the Automotive Industry |
TISAX consultants: how Finstein helps you prepare
How Finstein supports your TISAX programme

Finstein acts as your readiness partner, not your audit provider, so your TISAX assessment stays independent. Our team is trained on VDA ISA and TISAX and has hands-on experience helping companies prepare for their assessments. Our cyber security team includes 50 ISO 27001 Lead Auditors, 20 CISAs and 15 CEHs, and we combine ISO/IEC 27001, VDA ISA and India’s DPDP Act into one control framework.
| Service | What you receive |
|---|---|
| Objective and scope advisory | Confirmed labels, locations and scope structure, agreed with your customer |
| Gap assessment | A scored VDA ISA self-assessment, ISO mapping and a costed remediation plan |
| Remediation support | Policies, procedures, evidence packs, OT segmentation planning and prototype protection design |
| Pre-assessment | Mock interviews, evidence review and site walks that mirror the audit provider’s approach |
| Corrective action support | Root cause analysis and action plans that meet ENX timelines |
| Sustain | Internal audits, management reviews and renewal preparation |
Talk to our team about a VDA ISA gap assessment and a roadmap to your label.
About the authors
Sources
- ENX Association: TISAX Participant Handbook, version 2.8, 13 March 2025
- ENX Association: Changes to TISAX labels accompanying the ISA 6 release
- ENX Association: ISA version 6 now available
- ENX Association: TISAX price list and frequently asked questions
- VDA: Information security and the VDA ISA catalogue
- DQS: ISA catalogue 6.0 valid from 2024
- DNV: Transition to TISAX VDA ISA version 6
- DEKRA: VDA ISA catalogue version 6
- BSI: Transition to ISO/IEC 27001:2022
- ISACA Journal: Navigating the ISO/IEC 27001:2022 transition
Photographs
- Banner: a car body on a robotic assembly line. Photo: Lenny Kuhne on Unsplash
- Engineers reviewing work on an automotive development floor. Photo: ThisisEngineering on Unsplash
- Server racks and network cabling in a data centre. Photo: Taylor Vick on Unsplash
- Surveillance cameras guarding a facility wall. Photo: Scott Webb on Unsplash
- A padlock on a laptop keyboard, symbolising protected information. Photo: FlyD on Unsplash
- Stacks of files: ISO and TISAX both run on evidence. Photo: Wesley Tingey on Unsplash
- A cross-functional team working through the plan together. Photo: ThisisEngineering on Unsplash
- An industrial control panel: OT is now in TISAX scope. Photo: iSawRed on Unsplash
- The road to a TISAX label starts with the right scope. Photo: Raivis Razgals on Unsplash
- A working session around a project table. Photo: Dylan Gillis on Unsplash
All photographs are used under the Unsplash License. Diagrams by Finstein.
TISAX and ENX are registered trademarks of the ENX Association. VDA ISA is published by the Verband der Automobilindustrie (VDA). This guide is for general information. It reflects the VDA ISA 6 catalogue and ENX rules in force at the date of publication, and control topics are paraphrased. Confirm requirements against the current catalogue and handbook, and with your audit provider and customer, before acting. Timelines are planning assumptions, not commitments.


